Tool · Quote prep · Bao'an

Tick the RFQ before you email the plant

PNG-only briefs and “about 3 g” stall the quote. Tick required vs optional fields, copy a paste block for WhatsApp or the form, and say if soft trays may go steel on the same floor.

Checklist

RFQ fields that unlock a plant path quote

Tick what you already have. Required rows stop most quote stalls. Optional rows cut remake loops — especially when soft trays may go steel on the same Bao'an floor. We typically reply within 12 hours. Complete files help us identify the next steps.

Application

Required

0/4

Optional

0/8

Status

Fill required

Paste into email / WhatsApp / quote form

WYD Silicone RFQ checklist · Bao'an since 2006
Application: Soft → steel / depositor

Have:
(none yet)

Still missing:
- [ ] STEP / STL (or measured master photos with scale)
- [ ] What you pour / cast + peak temperature
- [ ] Target piece weight (g) or cavity ml + tolerance band
- [ ] Initial quantity and expected repeat-production needs
- [ ] Outer vs center weight sheet (if already pouring)
- [ ] Pitch / nest / jig notes (if depositor later)
- [ ] Shore A band or “recommend for pour”
- [ ] Food market docs (FDA / LFGB / none)
- [ ] Tray footprint L×W or cavity count guess
- [ ] Fill method (flood-scrape / hand / depositor)
- [ ] Do you need CAD creation or modification?
- [ ] Ship-to country + Incoterm preference

Notes: (none)

Ask: free DFM review; CAD creation or modification quoted by scope; prototype and production tooling quoted separately.
Contact: info@wydsilicone.com · +86 180 3814 7782

Where this sits on the quote path

Not buried in the blog index. Use it from Send files for a quote, the tools hub, or the site footer — then paste into the form notes.

FAQ

What should I send with my inquiry?
File (STEP/STL or measured photos), pour material + peak temperature, target weight or cavity ml with a band, and whether steel / depositor is on your 6–12 month calendar. We typically reply within 12 hours. A complete quote depends on the required project details.
How is this different from a soft-only RFQ blog?
Long articles are templates. This tool is the tick list + paste block you use before you hit send — with a soft→steel gate so we do not invent pitch from a photo later.
Do I need FDA / LFGB on every RFQ?
Only when food-contact or retail asks. Name the market (US FDA path / EU LFGB sections 30/31) when you do.
What is WYD MOQ and timing?
Soft trays often start around MOQ 20 per design. Prototypes usually 3–7 business days after CAD lock. Soft→steel and OEM molded parts stay on the same Bao'an floor (plant since 2006).

Checklist ready? Send the packet.

Paste into WhatsApp +86 180 3814 7782, email info@wydsilicone.com, or the quote form. We typically reply within 12 hours; complete briefs help us review Shore notes and timing — soft→steel and OEM on the same Bao'an archive since 2006.