Plant photos — not a webcam gimmick

Bao'an factory floor — real shots from the plant

Explore WYD's tooling, molding and inspection areas in Bao'an, Shenzhen. To review equipment relevant to your project, arrange a visit or request a video call. For an active order, ask your project contact which progress photos can be provided.

Soft mold trays (often from MOQ 20, prototype usually 3–7 days after CAD) and steel / depositor follow-on share this floor. OEM molded lines (baby, kitchen, medical-adjacent, industrial) sit here too — different quote discipline, same address: Room 201, Building N, Licheng Technology Industrial Park Phase III, Xinhe Avenue, Shajing, Bao'an, Shenzhen, China.

What buyers askStraight answer
Is this a livestream?No — dated plant photos. Call us for a live walkthrough.
Soft then steel same plant?Yes — lock pitch before metal; see depositor checklist.
Contactinfo@wydsilicone.com · +86 180 3814 7782

Floor gallery

Captions say what the bay is for. If a photo looks dated, ask — we will shoot the station that matches your RFQ.

WYD Silicone reception at the Bao'an plant

Reception

Plant reception in Bao'an. Floor stills below are the process evidence for an RFQ.

CNC machines and RTV mold benches on the green-floor WYD Bao'an plant

Production floor

CNC plus the RTV mold bay on the same green aisle. Soft trays and steel follow-on share this floor.

Gummy fill-weight check with a digital scale and silicone bear tray at WYD

QC bench

Fill-weight check on a gummy tray — inbound buyers should run the same honesty.

Soft silicone tray beside a matching metal cavity plate on a WYD bench

Soft vs steel bench

Same cavity map in soft and metal — lock pitch on the tray before you cut steel.

Ink-moxibustion block and matching high-detail silicone mold from WYD

High-detail custom mold

墨灸 block plus cavity — fine relief we quote as custom tooling, not a stock tray.

LSR metering and injection equipment on the WYD Bao'an floor

LSR bay

Used when molded parts need injection paths — not every mold tray job.

Machined metal tooling parts from a WYD silicone mold job

Metal tooling

Cavity finish and draft are locked on the tool before the first production pour.

A/B drum and pneumatic press cell at the WYD Bao'an plant

A/B drum / press cell

HCR / LSR work happens on a press cell — not a floating studio plate.

Buyer meeting at the WYD Bao'an plant with samples on the table

Plant visit

Ask for a walkthrough call if a still is not enough for your RFQ.

Visitor photo at WYD Silicone reception in Bao'an, Shenzhen

Visitor photo

Same legal name on the wall as on the quote — Room 201, Building N, Licheng Technology Industrial Park Phase III, Shajing, Bao'an.

Buyer and WYD staff reviewing silicone mold samples at the plant

Sample review

Pitch, Shore, and logo depth get written down — not left as brochure adjectives.

Silicone trays on a bench with autoclaves behind them at WYD

Tray bench

Soft confectionery trays and OEM lines share this Bao'an plant since 2006.

Two-roll mill mixing black HCR silicone at WYD Bao'an

HCR mill

Compound is milled for the job before it goes into the press.

HCR compression press bay on the green floor at WYD Bao'an

Press bay

HCR/HTV press cells. Route is quoted after the drawing.

Press and trim cell at the WYD Bao'an plant

Trim / press cell

Trim sits next to the press, not in a separate catalog studio.

LSR A and B mix pots at WYD Bao'an

LSR A/B pots

Liquid silicone prep. Not a compression mill.

LSR A/B drums on pallets at WYD Bao'an

A/B drums

Drum marks A and B. Ratio follows the material system.

Weigh-check of molded silicone parts at WYD QC

QC weigh

Weigh or count against the approved pack.

Full inspection bench at the WYD Bao'an plant

Full inspection

Write reject items before packing starts.

Labeled steel mold storage racks at WYD Bao'an

Mold storage

Tools stored by job number for reorder.

Cartons and silicone drums on pallets in the WYD warehouse

Warehouse

Inbound compound and packed goods on the same plant.

Green-floor corridor into WYD production rooms

Plant corridor

Walk-in to production rooms. Not a stock hall.

WYD Silicone reception desk at the Bao'an plant

Reception

Second angle of the plant reception.

Labeled WYD plant process board

Process board

Walkthrough board. Quote from the drawing, not the collage.

Related plant-side guides

Want proof on your SKU, not a brochure?

Send the drawing or tray photos. We typically reply within 12 hours. Complete files help us review the route — soft mold, steel follow-on, or molded OEM.