China factory · FOB Shenzhen
China custom silicone mold factory — FOB Shenzhen from Bao'an
WYD Silicone is the Bao'an / Shajing plant you RFQ for custom soft trays, HCR compression parts, and LSR parts — CAD, prototype, tooling balance, then FOB Shenzhen. We have run that room since 2006. That is a different clock from a US warehouse that ships a catalog tray in three days.
Soft-tray MOQ is 20 pieces per design. DFM review is free. CAD modification is about $50 when the model still needs lock — not a fee on every PO. Prototypes typically take 3–5 business days after CAD approval for suitable projects. Standard production typically takes 7–10 business days after approval; large or complex projects are scheduled by project, then FOB Shenzhen. Courier to a US door is extra time after the goods exist. Capability and process live on the manufacturer page; this page is the factory clock.
FOB Shenzhen clock vs a US warehouse clock
A US stock shop can pick a catalog SKU this week. We do not hold that wall. Do not compare our prototype day-count to their stock dispatch. US 3-day shop language is a comparison of clocks, not a brand we are chasing.
| Step | WYD Bao'an clock | Typical US catalog / warehouse shop |
|---|---|---|
| In-stock SKU | We do not hold a tray wall | Often same-week domestic |
| CAD modeling or modification | About $50, then you lock | Design deposit or in-house 3D, shop-specific |
| Prototype | 3–5 business days after CAD approval | Sample windows vary by that shop |
| Production after approval | 7–10 business days for standard production | Stock = pick/pack; custom = their queue |
| Ship start | FOB Shenzhen unless you name another Incoterm | US warehouse |
If the buy is one unmarked cube on Thursday, Shenzhen loses. If the buy is a cavity map, steel follow-on, or an HCR/LSR part on the same floor, this clock is the real one. US-brand WhatsApp hours stay on /usa-silicone-mold-buyers/.
What you can visit in Bao'an
Ask to see the process that matches your job: mill and preform for HCR compression, the LSR bay with a heated cavity, or the tray bench where a cavity map is cut. Dated stills already live on /baoan-plant/. We do not fake a CCTV feed; ask for a video call or a fresh photo of your job on the bench. Hours are GMT+8 — not a US phone bank.


Incoterm, documents, and who owns the tool
- Default ship start is FOB Shenzhen unless you name DDP or another term on the RFQ.
- Food-contact language is article/lot files (for example 21 CFR 177.2600) when the market needs them — not an FDA-approved factory line.
- Paying NRE is not automatic title to plates or inserts. Write ownership on the PI.
- A trader forwards a PDF. A factory marks draft, flash land, and depositor pitch on your file.
English: info@wydsilicone.com · +86 180 3814 7782. Address: Room 201, Building N, Licheng Technology Industrial Park Phase III, Xinhe Avenue, Shajing, Bao'an, Shenzhen, China.
Process illustration: a PO that assumed door-in-three-days
Hypothetical clock — not a named shipment
A US gummy brand sends STEP, 4 g pectin, half-sheet span, and compares our 3–5 business day prototype line to a Shopify 3-day warehouse claim. Honest path: CAD modeling or modification typically around US$50, CAD approval, prototype in the typical 3–5 business day window, sign-off, then standard production in the typical 7–10 business day window; large or complex projects are scheduled separately. FOB Shenzhen. Door time depends on their forwarder. We would not quote DDP 3-day from this floor.
Commercial parameters for a China-factory RFQ
- Soft-tray MOQ 20 pieces per design after approval.
- DFM review is free. CAD modification about $50 when the model needs lock — not a fee on every PO.
- Prototype usually 3–5 business days after CAD approval.
- Standard production typically takes 7–10 business days after approval; large or complex projects are scheduled by project, then FOB Shenzhen.
- Files: STEP, nest PDF, or measured photos plus destination and Incoterm.
Timelines are typical planning estimates and may vary with design complexity, revisions, material, tooling method, quantity and testing requirements. Shipping/transit time is separate.
When this China factory page is the wrong route
- Who we are and what the floor runs: /custom-silicone-mold-manufacturer/
- US timezone / WhatsApp path: /usa-silicone-mold-buyers/
- File pack: /custom-silicone-mold-quote/
- Tool vs piece price: /silicone-mold-cost/
- Send the RFQ: /contact/

China-factory FAQ
- Are you a China factory or a trading desk?
- A Bao'an plant since 2006. Visit Room 201, Building N, Licheng Technology Industrial Park Phase III, Xinhe Avenue, Shajing, Bao'an, Shenzhen, by appointment. Match the PI entity to the door.
- How fast do molds arrive in the US?
- Prototype typically takes 3–5 business days after CAD approval for suitable projects; standard production typically takes 7–10 business days after approval. Large or complex projects are scheduled by project, then freight is added separately. That is not a 3-day US warehouse dispatch.
- Why is CAD listed as about $50?
- DFM review is free. CAD modification is about $50 before the tooling balance when the model still needs lock — not a fee on every PO. Exact line is confirmed on the written quote.
- How should U.S. buyers plan the delivery schedule?
- Separate design approval, prototype preparation, production and international transport in the schedule. Send the destination and required arrival date so the quotation can identify the proposed shipping terms and timing assumptions.
Send the file and the Incoterm
We will put CAD-lock, sample sign-off, and FOB Shenzhen dates on the PI instead of a 3-day slogan.
